If you have a use deputy action with parallel set to no, does that assume the deputy execution is serial, meaning the test waits until the action lines associated with the use deputy are completed before moving on?

Yes, that is correct. Using the use deputy action with the parallel argument set to no is, by definition, serial synchronous remote execution. The block of action lines following use deputy (which is lower-bounded by the next use lead or use deputy action) is sent to the specified deputy and executed by it. In the meantime, nothing happens: execution on the lead machine is suspended until the deputy has completed execution of its block.


Copyright © 2024 LogiGear Corporation. All rights reserved. LogiGearはLogiGear Corporationの登録商標であり、Action Based TestingおよびTestArchitectはLogiGear Corporationの商標です。ここに記載されているその他の商標は、各所有者の財産です。

LogiGear Corporation

1730 S. Amphlett Blvd. Suite 200, San Mateo, CA 94402

Tel: +1 (650) 572-1400